The short version
- Deposits of 10% to 30% are common. Jobs with special-order materials often run higher.
- Some states cap the deposit on home-improvement work. Check yours before you set a standard.
- Tie later payments to finished stages of work, not to calendar dates.
- Put the amount, the due date and what the deposit covers in the contract.
A deposit does three things. It pays for materials you have to buy before you start, it holds a place on your schedule, and it shows the customer is committed. The right amount depends on the job and, in some states, on the law.
What's typical
- Small repairs and service work: often no deposit. Payment is due when the work is done.
- Most residential projects: commonly 10% to 30% of the price at signing.
- Jobs with custom or special-order materials: often more, because cabinets, windows or flooring ordered for one job can't go back.
A useful rule: the deposit should cover what you have to spend before the first day of work. If it covers much more than that, expect the customer to ask why.
State limits on deposits
Several states cap what a contractor can collect up front on home-improvement work. Two examples:
- California: the down payment on a home-improvement contract can't be more than $1,000 or 10% of the contract price, whichever is less.
- Maryland: a contractor can't take a deposit of more than one-third of the contract price.
Other states have their own rules, and some set rules for the payments that come after the deposit too. Your state's contractor licensing board publishes them. Look them up before you choose a standard deposit, because taking too much can put your license at risk.
Progress payments
On a job that runs longer than a week or two, split the balance into payments tied to finished stages. For a bathroom remodel that might be:
| When | Share |
|---|---|
| At signing | 20% |
| Demolition and rough plumbing complete | 30% |
| Tile complete | 30% |
| Final walkthrough | 20% |
Use stages, not dates. "Due when tile is complete" protects both sides: you are paid for what is done, and the customer never pays ahead of the work. Keep the last payment large enough that both of you care about the final walkthrough.
What to put in writing
- The deposit as an amount, and when it is due
- What it covers, such as materials ordered for the job
- Whether any of it is refundable if the customer cancels, and until when
- Each later payment and the stage that triggers it
- How you take payment: check, card, bank transfer
How this looks in QuoteDesk
On a quote you set a deposit percentage and, if you want them, progress payments. The quote and the signed contract list each payment and its amount, so the schedule is agreed before work starts. QuoteDesk doesn't collect the money: you take payment the way you do today.
Next: what to include in a contractor contract.