The short version
- A quote has two jobs: win the work, and prevent the argument later.
- Write the scope so that someone who wasn't at the walkthrough could follow it.
- Say what is not included, how long the price is good for, and what is due when.
- Send it the same day, and make it easy to sign.
Most quotes that lose the job weren't too expensive. They were late, or vague, or hard to say yes to. A good quote is clear enough that the customer trusts the number, and specific enough that nobody argues about it in week three.
What every quote needs
- Who you are. Business name, phone, email and your license number. Many states require the license number on a contract, and customers look for it.
- Who it's for. The customer's name and the address of the job.
- A job title. "Kitchen rewire" or "Roof replacement". It is what both of you will call the job from now on.
- The scope. What you will do, in plain words.
- Line items. Each with a quantity, a unit and a price.
- What isn't included. The work a customer might assume is in the price.
- Tax and the total.
- The deposit and the payment schedule.
- How long the price is good for.
- Your terms. Warranty, how changes are handled, and how either side can cancel.
- A place to sign.
Write the scope for a stranger
The test for a scope is whether someone who wasn't at the walkthrough could read it and know what is being built. Compare these two:
Rewire kitchen. $2,400.
Replace the kitchen's two existing circuits with four new 20-amp circuits from the panel. Install six GFCI outlets at the counters. Permit and inspection included. Drywall patching not included.
The second version takes one more minute to write. It also answers the three questions that otherwise turn into phone calls: how many outlets, is the permit included, and who fixes the wall.
How much detail in the line items
Enough that the customer can see where the money goes. Not so much that they start shopping each line at the hardware store.
- Give each line a unit. Each, per foot, per square foot, per square, or per job. A unit makes a change in scope easy to price: two more outlets is two more times the price of one.
- Combine labor and materials when the customer buys a result. "GFCI outlet, installed" is clearer than a line for the part and a line for the labor.
- Separate what you pass through. Permits, dumpsters and special-order items read better as their own lines than buried in a bigger number.
Exclusions and allowances
An exclusion is work you are not doing. An allowance is a budget for something that hasn't been chosen or can't be seen yet.
- Exclusions: painting after drywall repair, moving furniture, permits the owner is pulling, repairs to anything found behind the wall.
- Allowances: "Vanity and top: $1,200 allowance" or "Rotten decking: $95 a sheet". The customer has agreed to the price before the surprise arrives.
Deposit, payments and an end date
State the deposit, when the rest is due, and how long the quote stands. Material prices move, and a quote without an end date is an open offer at last season's prices. Thirty days is common.
Some states limit how large a deposit can be. See how much deposit a contractor should ask for.
An example quote
| Item | Qty | Price | Amount |
|---|---|---|---|
| Rewire kitchen circuits | 1 job | $2,400.00 | $2,400.00 |
| GFCI outlets, installed | 6 ea | $85.00 | $510.00 |
| Subtotal | $2,910.00 | ||
| Tax (7%) | $203.70 | ||
| Total | $3,113.70 | ||
| Deposit due at signing (30%) | $934.11 |
Below the numbers go the scope, the exclusions ("Drywall patching and painting are not included"), the end date ("This quote is good for 30 days") and your terms.
Send it the same day
A customer who asked three contractors for a price is comparing whatever has arrived. If yours is in their hands while you are still in the driveway, it is the one they are reading while the job is fresh.
That is the reason to write quotes on your phone instead of at the kitchen table at night. With saved line items, a quote like the one above takes a few minutes.
Make it easy to say yes
A quote the customer has to print, sign, scan and email back will sit. A quote they can sign with a finger on their phone gets signed. Once it is signed, the quote and your terms are the contract. See whether electronic signatures are legal on contractor contracts and what a contract should include.